Canadian Centre for Management Development

Gross Area:
4,600 m2

Construction Cost:

View of Block B Reception Desk

Programming, design, tendering and construction of a three phase fit-up for the federal government’s primary management and executive training facility, within a heritage complex consisting of 4 buildings (Blocks A, B, C, D).
  • Phase 1: reconfiguration and upgrade of office space within a heritage-designated structure (Block B).
  • Phase 2: creation of an innovative office setting and cafeteria for two organizational directorates (Block D)
  • Phase 3: creation of a state-of-the-art training facility with resizable multi-media conference rooms (Block C).
The core of the facility is the central complex of conference rooms and activity spaces, which can be separated into discrete, acoustically isolated chambers or joined into one large central space through the action of horizontally and vertically sliding partitions